Client Viña San Pedro Tarapacá
Location Molina, Región de Maule, Chile
Date July 2020
Flow 900 m3/d
Load 3.600 kg DBO/d
Solution Liquid Industrial Waste Treatment.

Liquid Industrial Waste Treatment Plant

Waste Treatment Plant consisting of the following processes: Equalization, activated sludge aerobic system, sludge dehydration.

The scope of the project consisted of engineering, equipment supply, electromechanical assembly and start-up supervision.

Back to list

Projects