Client TECNOFAST – Quellaveco
Location MOQUEGUA – Perú
Date 2018
Plant capacity 67.5 m3/day
Solution Potabilization

Drinking water plant, Camp Caracoles

Treatment system for the removal of suspended solids and turbidity through multimedia filters and a disinfection system.
The scope of this project covers the development of detailed engineering, equipment supply, installation and commissioning.

Back to list

Projects