Client SERPETBOL Camp San Martin
Location CUSCO – Perú
Date 2012
Flow 60m3/día
Load 18 Kg/día de DBO
Domestic Wastewater Plant, Kiteni Camp
The design of the domestic wastewater treatment plant for 180 people that consists of an aerobic biological treatment by Activated Sludge with conventional aeration, followed by a disinfection process. For the sludge line, a digestion and thickening stage is considered.
The scope of this project covers engineering development, equipment supply, assembly and commissioning.