Client Viña San Pedro Tarapacá
Location Molina, Región de Maule, Chile
Date July 2020
Flow 900 m3/d
Load 3.600 kg DBO/d
Solution Liquid Industrial Waste Treatment.
Liquid Industrial Waste Treatment Plant
Waste Treatment Plant consisting of the following processes: Equalization, activated sludge aerobic system, sludge dehydration.
The scope of the project consisted of engineering, equipment supply, electromechanical assembly and start-up supervision.